-
Neil Nelson
- Posts: 46
- Joined: Tue May 02, 2000 9:06 pm
Post
by Neil Nelson » Sat Oct 28, 2017 8:29 pm
Hey Guys,
In Sherrill's book there is a drawing of how to layout plywood for cutting floorboards. There are two "floorboard packing strips" in the layout. My original floorboards do not have these installed and there is no info in the book regarding installation of same.
Can someone who has installed these please tell me where they go? They are too long to fit along the tunnel, and unnecessary along the outside of the floorboard and would make the floors run at an angle side to side.
I just don't see the need for these. Am I missing something?
Neil Nelson
TC 4161
Fleming Island, Fl
-
Benny Grumer
- Posts: 22
- Joined: Sun Apr 15, 2012 8:06 am
Post
by Benny Grumer » Sat Oct 28, 2017 10:39 pm
NeilThe strip goes along the drive shaft tunnel. You have to cut the strip to allow a relief for the boltthat connect the tunnel to the chassis rails. RegardsBenny
__________ Information from ESET NOD32 Antivirus, version of detection engine 16320 (20171028) __________
The message was checked by ESET NOD32 Antivirus.
http://www.eset.com
Users browsing this forum: No registered users and 12 guests